The front wall of offices 253 and 254 shall be relocated to the corner of wall of office 219.…
The Saltstone Process Room Ventilation comfort cooling design is not adequate during periods that personnel are in the Saltstone Process Room perfo…
Remove LCS-37, 38, 39, and 44 Radiation Monitors per DCP No. J-DCP-S-05009 in 221-S.…
A quonset hut (717-50F) is being built in FTF south of the existing structure 717-30F.…
Remove and excess 2 welding machines and 1 plasma cutter from building 717-F.…
719-5N Rewire all telecommunications wiring and drops…
SRNL will test microbial extraction (biomining) of rare earth elements (REEs) and metals from REE and metal containing materials in lab scale studi…
This activity details the general operation of the FormLabs Form2 SLA resin 3D printer along with the post-processing tasks associated with 3D prin…
Remove abandoned bioassay equipment located in 735-A, C-Wing (WO No. 1832619), remove three steam/chilled water HVAC units, two abandoned exhaust f…
This activity will evaluate the chemistry and engineering aspects of a process for stripping chloride from nitric acid solutions using heat, gas sp…