A renovation of the area will be performed prior to the installation of the new CNC Mill.…
The coolant will be drained and replaced with new coolant.…
705-N Dining Room Renovation.…
234-H Inert HVAC Installing conduit for damper controls.…
D and R the 234-H tankless water heater in the kitchen and run an insulated domestic water line from the existing 234-H men's restroom water heater…
Install sealant on the UV Unit at Central Sanitary Wastewater Treatment Facility (CSWTF).…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F).…
789-2B Replace ceiling tiles (suspect mold) in operator station.…
Raman and absorption spectroscopy instrumentation will be used in various labs at HTRL to determine the chemical and physical properties of samples…
The Analytical Development Section (ADS) in SRNL performs a variety of dissolution methods.…