Remove and excess 2 welding machines and 1 plasma cutter from building 711-1F.…
Add electrical outlets at Centerra Stations in corridor outside E and I Office per Work Instructions and E-DCF-L-00523.…
The PA removes and replaces the complete Environmental Chamber system units No. 2 (LSS.002), 3 (LSS.003), 1 (LSS.001), and 10 (LSS.010) in the 234-…
A Subcontractor shall provide Savannah River Nuclear Solutions (SRNS) Railroad Operations with a locomotive for the planned work scope across the S…
Install and anchor pipe bender at 711-N.…
LANL Plutonium oxide samples are prepared via closed vessel hot block dissolution and aliquoted for impurity analyses.…
This EEC covers analytical methods for Radiochemical Measurements.…
218-1H LED Lights Upgrade…
Installing new power pole for the SOM desk in 234-H.…
Install eight new water table monitoring wells at ELLWF.…