Housekeeping the 105-C Stack Area.…
Replace Building 751-1A Fire Alarm System.…
This EEC covers all maintenance activities performed by SRNS organizations that have the potential to disturb gasket and gasket-like materials (i.e…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required.…
The Krieger project is a proposed advanced technology test of radiological/nuclear detection equipment (gamma and neutron detection).…
This EEC includes all cell, molecular, and microbial biological research performed within the BSL2 laboratory located in 999-1W ACTL facility, in l…
The FACSmelody is a flow automated cell sorter (FACS) and flow cytometer used for analysis and sorting of single cells using light scattering and l…
A chemical vapor deposition (CVD) method will be used to prepare nanomaterials.…
Installation of flow restricting orifices on flammable gas cylinder installations throughout 773-A Section C.…
This EEC supports the installation of a pre-fabricated "Butler" style building to serve as the SRNL Construction Shop per the design input document…