The objective of this work is to analyze for iodine speciation in environmental samples (aqueous and solids) by testing for iodide, iodate and orga…
Quarterly diesel fuel analyses will be performed in 999-1W, 129 for the Savannah River Remediation (SRR).…
Install three Willscot 40 ft. X 8 ft. Container Office Combo Units on the concrete pad (No. 710-A), located on the west end of building 730-A.…
In Building 717-8N, reconfigure section of exhaust trunkline ductwork and install new duct from reconfigured trunkline to Powermatic Disc Sander to…
De-pinning/Devalving of Empty Gas Cylinders that once contained flammable and rad/nonflammable gas.…
Provide funding to Clemson University to design, develop, and demonstrate a megawatt scale, multi-source heat recovery system with a flexible grid …
This research is examining sex ratios of amphibians populations across SRS in contaminated and non contaminated wetlands.…
SRSCRO will demolish modular office building 704-16S after removal of all universal waste and dispose of demolition debris in the C
The current Regulated Drain Collection Tank (RDCT) cell sump pump has failed and must be replaced.…
Subcontractor to perform guardrail repairs on Road C.…