This EEC covers the installation of tritium signs at 711-1N, 711-2N, 711-9N, 704-4N, 725-1N, 713-1N--1st floor, 713-1N--2nd floor, 717-10N, 717-8N,…
Remove window HVAC and install new 3 Ton unit with duct.…
Replace HVAC Unit No. 2 at 704-4N…
Replace HVAC unit at 713-N Tool Room…
Seal expansion joints in floor at the large roll up doors of 713-2N warehouse. Remove old material and install new.…
Remove Approximately 170' of Abandoned Steam Line and the F-Area perimeter fence and associated gates/posts located west of 221-33F.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
The Activity proposed by this EEC is the disposal of routine solid Low-Level Waste (LLW) and Transuranic (TRU) waste generated by performance of An…
The scope of this work is to Install a partition wall around the old communication rack at the South end of the 221-H control room.…
Remove Valve V-061 To Isolate Old Abandoned Well Water Header.…