Modify existing lab Instrument Air (IA) in Bldg. 735-A in Lab A-151, to serve new 11. 4 Tesla Bruker 500 NMR magnet.…
Remove/Replace Flooring at Criticality Control Overpack (CCO) Pad Entry Control Facility…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory (Building 999-1W…
X-ray diffraction analysis of various crystalline samples will be performed in 773-A C-116.…
SREL will be trapping mice and rats to evaluate the abundance and diversity of small mammals on the SRS as compared to historical estimates from th…
CM-4320 Renovate Clean Room in 711-N.…
Replace Trailer Space Roll Door Cover, North Side Purification. Door cover may contain asbestos/galbestos material and PCBs…
This EEC covers the design of the Tritium Process Control and Automation Engineering (PC and AE) needs climate-controlled storage for parts. This m…
The facility needs a redesign of the current camera grout hopper lid assembly to ease maintenance activities.…