The purpose of this project is to synthesize getters from bismuth and zinc salts, which can then be used to test their iodine sequestration capabil…
731-1N Break Room Remodel Room No. 101.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Building 714-7N minor modifications to support K-Area missions and additional storage needs.…
192-2K Fire Water System Jockey Pump Controller Replacement (Electric and Diesel).…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 17), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…
Repair Wall Damage Under Window in 773-65A Room 12.…
The purpose of this EEC is to document the property transfer of three mockup test gloveboxes for SRPPF that are finishing fire suppression testing.…
Perform preventative maintenance and repair loose fill in cooling tower.…
The existing Programable Logic Controller (PLC) is old and a newer upgraded PLC is needed.…