This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS. This EEC is applicable to steam line work occur…
This EEC describes the activities required for the safe removal of the existing wall panels in the 772-7B room 10 boat storage on the North, South …
CM 4351 REPLACE HEATERS IN BM SHOP at 717-1N. CM 4369 INSTALL NEW WELDER at 717-1N. CM 4298 INSTALL PRESS BRAKE at 711-N. CM 4381 INSTALL NEW P…
Replace the eyewash station at 716-N.…
Repair ceiling grid at 731-2N room 102.…
241-125H: Evaluate/Correct Louvers.…
This activity involves refurbishments/repairs to domestic water monitoring equipment and waterproofing improvements for domestic water pits across …
Subcontractor will perform roof repairs on 705-1C. The Subcontractor "will not" disturb the existing roof on 705-1C.…
Subcontractor will perform roof repairs on 702-C. The Subcontractor "will not" disturb the existing roof on 702-C.…
Contractor to clean/dispose of bird droppings located at 717-A.…