Subcontractor will provide roof repairs at 704-7B and 704-12B. The Subcontractor will not disturb the existing roof while performing these repairs …
Adding down-line electronic reclosers on distribution power line wood poles and replacing reclosers in existing substations.…
K-Area Plutonium Down-Blend Processing Enhancements: Leaded Glass Shielding…
Deactivation of facilities 284-8F and 280-1F.…
A Japanese Cask will have a temporary modification made to allow it to be repositioned from the side.…
Per modification traveler MT-TRI-2024-00002, two additional unclassified DCS workstations are required to be installed in the Building 233-H Centra…
Remove water fountain and associated water filter from 247-H. Replace the water fountain with a bottle filling / water fountain combination.…
Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H.…
Incoming 13.8kV and 125VDC power to 784-A switchgear is to be removed.…
Slug testing is to be completed at twenty (20) wells at the CMP Pits.…