PBI-24 - Replacement of side entry door at 780-2A…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is NOT required.…
The H-Area Tank Farm (HTF) facility needs a permanent design for supplying Chromate Water (CRW) to Tanks 35-37 above grade due to a recent undergro…
Work consists of a combination of model simulations, controlled laboratory studies, and a field study to identify the dispersion and settling prope…
Additional intrusion detection sensors (IDS) to be added in the 105-L Process Room and Transfer bay…
The area radiation monitors used in the 264-2H Area Radiation Monitoring System (ARMS) are obsolete and need to be replaced. This EEC covers the de…
Solvent Extraction studies are performed to demonstrate the ability to separate desired metals from other impurities for eventual recovery and reus…
Columns of zeolite molecular sieve are used to extract noble gases of interest from room air.…
Provide telecommunications to trailers 722-2N and 722-3N.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…