This project studies ongoing uranium transport in Tims Branch to aid in future clean up.…
Install new HVAC unit for Men and Women locker rooms/restrooms at 705-N. This includes installing new concrete, duct work, insulation, packaged air…
During a housekeeping walkdown it was observed that the walls, doors, and handrails at the North Dock need to be repainted.…
This EEC is for the relocation of Recycle Vessel Vent (RVV) No. 1 Fan Assembly and RVV No. 2 dampers in H-Canyon Building 292-H per MT-HCA-2021-000…
Repair and coat the chemical containment dikes in 782-3A. Revision 1 is necessary to include the rerouting of power and signal cables for the scope…
Repair cracks, joints, and patchwork (spalling) on concrete intruder barrier at R-Area Seepage Basin…
The purpose of this project is to synthesize getters from bismuth and zinc salts, which can then be used to test their iodine sequestration capabil…
731-1N Break Room Remodel Room No. 101.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Building 714-7N minor modifications to support K-Area missions and additional storage needs.…