Abandon wells BSE-003C, BSW-002C, and NEP-001D, and install replacement wells BSE-003CR, BSW-002CR, NEP-001DR for the Mixed Waste Management and Fa…
The scope of work for P1-BA/BB Blower Replacement Open Glovebox Maintenance is to replace two P1 blowers, replace two glass panels, and replace a …
Scope change to expand renovations to other areas in 704-L excluding the maintenance areas.…
Repairing holes in sheetrock and painting the offices, Kitchen remodel, conference room Audio/Visual upgrades…
The MCC-515-1 (ETF), CLI- FE-28101-ELNH-MCC-515-1, is an outdoor motor control center(MCC) and is approaching the end of its useful life.…
Due to the dissimilar metals, a dielectric union is needed to help prevent Galvanic Corrosion between the carbon steel piping of the safety shower/…
Replace 784-7A fuel oil tank level probe.…
Paint room 18 at 703-43A.…
This initiative is examining the activities associated with reducing F Area Complex Operations and all facility support organization's schedule to …