Replace HVAC unit at 713-N Tool Room…
Seal expansion joints in floor at the large roll up doors of 713-2N warehouse. Remove old material and install new.…
Remove Approximately 170' of Abandoned Steam Line and the F-Area perimeter fence and associated gates/posts located west of 221-33F.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
The Activity proposed by this EEC is the disposal of routine solid Low-Level Waste (LLW) and Transuranic (TRU) waste generated by performance of An…
The scope of this work is to Install a partition wall around the old communication rack at the South end of the 221-H control room.…
Remove Valve V-061 To Isolate Old Abandoned Well Water Header.…
Paint building exterior at 251-H.…
Install approximately 50 new poles and overhead fiber to Dominion Energy Substation 504-5G. Cable will be run on new poles installed within the exi…
Laboratory 141 and 193 of the 999-2W facility will be used to perform general chemical and nanomaterials research support for a variety of DOE-rela…