The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment, transmission towers, and auxiliary e…
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment,transmission towers, and auxiliary elec…
SST will obtain perrnits, design and construct an annex to the Training and Cascade Oflice Iluilding (C-104) including site utilities, and associat…
The Tennessee Valley Authority (TVA) is designing, constructing, and will be operating a new substation for the U.S. Department of Energy (DOE) at …
DOE at the Paducah Gaseous Diffusion Plant (PGDP) plans to design and construct a new electrical distribution system to bypass the C-531 Switchyard.
DOE at the Paducah Gaseous Diffusion Plant will construct and furnish a single-story firing range, walkways, gravel parking lot, and gravel access...
DOE at the Paducah Gaseous Diffusion Plant will be constructing and installing upgrades within the C-104 Building to support secure telecommunicati…
DOE will be performing a realignment of the Paducah Gaseous Diffusion Plant 229 Boundary. The project will involve surveying, preparation, and inst...
DOE plans to deactivate, demolish, and disposition trailers and small structures at the Paducah Gaseous Diffusion Plant that are aging and/or deter…
DOE will replace a failed concrete culvert located under Rail Track #1 approximately 1.7 miles southwest of the Paducah Gaseous Diffusion Plant. Fa…