BPA proposes to continue funding the Oregon Department of Fish and Wildlife (ODFW) for ongoing vegetation management and routine maintenance work t…
Bonneville Power Administration (BPA) proposes to upgrade the existing equipment at Fairview Substation. …
The Bonneville Power Administration (BPA) proposes to allow the Port of Portland (Port) and its contractor to access and apply herbicide on a 2,900…
Bonneville Power Administration (BPA) proposes to raise the Ostrander-Pearl No. 1 transmission line including raising the height of structure 10/6 …
Bonneville Power Administration (BPA) proposes to transfer ownership of several hatchery facilities to the Confederated Tribes of the Umatilla Indi…
Bonneville Power Administration proposes to provide funds to the Confederated Tribes of the Warm Springs reservation of Oregon to replace a pump at…
CX-101652: Coupled Aerodynamic and Hydrodynamic Hybrid Simulation of Floating Offshore Wind Turbines
Award Number: DE-EE0008960, CX(s) Applied: A9, B5.15, Wind Energy Technologies Office, Location(s): OR, Office(s): Golden Field Office
BPA proposes to allow WAVE Broadband to install conduit for fiber optic cable across the BPA fee-owned Keeler-Alston transmission line right-of way…
Award Number: DE-EE0008829, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OR, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to modify an existing Umatilla Electric Cooperative (UEC) right-of-way easement in two locations acr…