BPA proposes to fund Benton SWCD for monitoring and evaluation projects on the Upper and Middle reaches of the Willamette River.…
BPA proposes to fund the Confederated Tribes of Warm Springs Reservation of Oregon for ongoing research and monitoring.
BPA proposes to fund the Nez Perce Tribe of Idaho for restoration activities in the historical floodplain along River Mile 22 of theWallowa River.…
Install a culvert, and improve and maintain ditching on access roads near line mile 179 of the Ashe-Marion No. 2 high voltage transmission line in …
BPA proposes to allow Comcast to install fiber optic cable across the BPA fee-owned Longview-Washington Way transmission line right-of way.…
BPA proposes to fund a floodplain reconnection project on land owned by Oregon State Parks and Recreation District on the Willamette River.…
BPA proposes to perform routine maintenance on the Timber Tap transmission line access roads.…
Remove the end of life asphalt roof shingles, overlay existing wood deck, and install new 35-year asphalt shingles.…
Clean Rural Shared Electric Mobility Project (CRuSE) …
BPA proposes to interconnect Wheatridge Wind Energy, LLC’s 300-megawatt (MW) Ella Butte wind development project to BPA’s electrical transmission s…