BPA is proposing to fund the City of Eugene to purchase the Black Oak Basin, which is a 120-acre parcel of land located about 1 mile east of Eugene…
Demolish and replace the existing fence by Building 25.…
Preparing, patching, and repainting all exterior surfaces of the six-story tower.…
Remove the end of life asphalt roof shingles, overlay existing wood deck with 0.5" plywood, and install new 35 year asphalt shingles.…
BPA is proposing to fund the Confederated Tribes of Siletz Indians to purchase the Camp Creek Hills, which is a 504 acre-parcel of land located abo…
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
BPA proposes to allow the installation of a water line and a corresponding water meter in BPA’s fee-owned right-of-way off of S. Thayer Road in the…
CX-101705: PURE HYDROGEN PRODUCTION THROUGH PRECIOUS-METAL-FREE MEMBRANE ELECTROLYSIS OF DIRTY WATER
Award Number: DE-EE0008841, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): OR, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to continue funding the Pacific States Marine Fisheries Commission (PSMFC) for ongoing work on the C…