Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration
Timber Tap to Forest Grove-Keeler #1 Access Roads CX(s) Applied: B1.3 Date: 09/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Wave Energy Test - New Zealand Multi-Mode Technology Demonstration at the US Navy's Wave Energy Test Site CX(s) Applied: B3.6 Date: 09/19/2013 Location(s): Oregon Offices(s): Golden Field Office
Brasada-Harney Number 1 Access Road Maintenance Project CX(s) Applied: B1.3 Date: 09/18/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Hydrate Evolution in Response to Ongoing Environmental Shifts CX(s) Applied: A9 Date: 09/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Assessing the Response of Methane Hydrates to Environmental Change at the Svalbard Continental Margin CX(s) Applied: B3.6, Other: Biological & Geochemical Analysis-Lab Date: 09/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laborat...
Hebo Substation Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Alvey-Lane #1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Buildings 7-11 Sidewalk Replacement CX(s) Applied: B1.15, B2.1, B2.5 Date: 09/11/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
McLoughlin Substation Equipment Additions CX(s) Applied: B1.7 Date: 09/05/2013 Location(s): Oregon Offices(s): Bonneville Power Administration