Bonneville-Hood River Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 03/04/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Windwave Fiber Installation at Big Eddy Substation CX(s) Applied: B4.7Date: 02/25/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Access Road Easement Acquisition for DeMoss-Fossil No. 1 Transmission Line CX(s) Applied: B1.24Date: 02/24/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Coyote Springs-Boardman Fiber Project CX(s) Applied: B4.7Date: 02/17/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Keeler Substation Septic System Retirement CX(s) Applied: B1.27Date: 02/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Damper Installations on the Cougar-Thurston #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 02/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Reston Substation Telecommunication Upgrades CX(s) Applied: B1.7Date: 01/26/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Hood River-Coop Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 01/20/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Noble Oaks 2 Property Acquisition and Stewardship Funding CX(s) Applied: B1.25Date: 01/19/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Install Concrete Slab at Pendleton Fish Acclimation Facility CX(s) Applied: B2.5Date: 01/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration