Correction of Western Oregon Line Impairments CX(s) Applied: B1.3Date: 07/20/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Big Eddy-Troutdale No. 1 230 Kilovolt Transmission Line Mile 38 and 39 Priority Conductor Replacement Project CX(s) Applied: B1.3Date: 07/17/2015 Location(s): OregonOffices(s): Bonneville Power Administration
NREL- Wind Forecast Improvement Project in Complex Terrain (WFIP2) - NREL Tracking No. 15-020 Award Number: DE-AC36-08GO28308 CX(s) Applied: A9, A11, B3.1 National Renewable Energy Laboratory (NREL) Date: 07/13/15 Location(s): OR Office(s): Go...
Rainbow Farms Property Acquisition Funding and Stewardship Funding CX(s) Applied: B1.25Date: 07/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Wood Pole Replacements on Salem-Grand Ronde #1 & Grand Ronde-Boyer #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 07/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Malin-Hilltop #1 Wood Pole Replacement CX(s) Applied: B1.25Date: 07/02/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Albany-Eugene No. 1 Nesting Platform Relocation CX(s) Applied: B4.6Date: 07/01/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Bell Substation HVAC Replacement CX(s) Applied: B1.3Date: 06/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Capitol Peak Communication Site Back-up Generator Replacement CX(s) Applied: B1.3Date: 06/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Advanced Laboratory and Field Arrays (ALFA) for Marine Energy Award Number: DE-EE0006816 CX(s) Applied: B3.16 Water Power Program Date: 06/17/2015 Location(s): OR Office(s): Golden Field Office