Oregon State University - Bio-Lamina-Plates Bioreactor for Enhanced Mass and Heat Transfer CX(s) Applied: B3.6 Date: 11/14/2013 Location(s): Oregon Offices(s): Advanced Research Projects Agency-Energy
Upgrade Six Wireless Communication Sites (Clear Creek, Evergreen, Fruit Valley, KSLM, Minnehaha, Popcorn) CX(s) Applied: B1.19 Date: 11/06/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration
"Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center
CX(s) Applied: B1.7 Date: 11/01/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration"
CX(s) Applied: B1.7 Date: 11/01/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration"
Severe Environment Corrosion Erosion Research Facility (SECERF) CX(s) Applied: B3.6 Date: 10/29/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Lightspeed Networks Inc. Fiber Installation CX(s) Applied: B4.9 Date: 10/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Transforming Photovoltaic Installations Toward Dispatchable, Schedulable Energy Solutions CX(s) Applied: B3.6, B5.15 Date: 10/17/2013 Location(s): Oregon Offices(s): Golden Field Office
Balancing Authority Area Services Agreement with Port Townsend Paper Corporation CX(s) Applied: B4.1 Date: 10/10/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Security Upgrades at Multiple Substations CX(s) Applied: ? Date: 10/02/2013 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Analytical Physics - Wavelength Dispersive X-Ray Fluorescence Spectroscopy CX(s) Applied: B3.6 Date: 10/01/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Chemawa-Salem #1 & #2 Access Roads CX(s) Applied: B1.3 Date: 09/27/2013 Location(s): Oregon Offices(s): Bonneville Power Administration