Test Area North (TAN)-601 Fiber Optic Cable Installation CX(s) Applied: B1.31Date: 12/07/2015 Location(s): IdahoOffices(s): Nuclear Energy
Idaho Falls (IF)-675 Majestic Park Portable Isotopic Neutron Spectroscopy (PINS) Laboratory (MPPL) CX(s) Applied: B2.1Date: 11/30/2015 Location(s): IdahoOffices(s): Nuclear Energy
Microgrid Research Laboratory Remodel CX(s) Applied: B1.31Date: 11/30/2015 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-653 Machine Shop Reconfiguration and Equipment Installation Project CX(s) Applied: B1.31Date: 11/20/2015 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-1608 Water Fountain Replacement CX(s) Applied: B1.15, B1.24Date: 11/20/2015 Location(s): IdahoOffices(s): Nuclear Energy
Relocate Tent Structure from Idaho Nuclear Technology and Engineering Center to Materials and Fuels Complex CX(s) Applied: B2.5Date: 11/14/2015 Location(s): IdahoOffices(s): Nuclear Energy
Central Facilities Area (CF)-1611 Emergency Communication Center Electrical Reconfiguration CX(s) Applied: B3.1Date: 11/14/2015 Location(s): IdahoOffices(s): Nuclear Energy
Hot Fuel Examination Facility Stack Sampling Tracer Gas Testing CX(s) Applied: B2.1Date: 11/14/2015 Location(s): IdahoOffices(s): Nuclear Energy
Materials and Fuels Complex (MFC) Machine Shop Reconfiguration and Installation Project CX(s) Applied: B2.5Date: 11/09/2015 Location(s): IdahoOffices(s): Nuclear Energy
Materials and Fuels Complex (MFC) Machine Shop Reconfiguration and Installation Project CX(s) Applied: B1.31Date: 11/09/2015 Location(s): IdahoOffices(s): Nuclear Energy