Advanced Test Reactor Complex Road Repairs CX(s) Applied: B2.5, B1.3Date: 02/05/2016 Location(s): IdahoOffices(s): Nuclear Energy
Radioisotope Power System Heat Source Storage Project CX(s) Applied: B1.30Date: 02/01/2016 Location(s): IdahoOffices(s): Nuclear Energy
U.S. High Performance Research Reactor Fuel Development Post Irradiation Examination CX(s) Applied: B3.6Date: 01/26/2016 Location(s): IdahoOffices(s): Nuclear Energy
Installation of New Ice Machine in Test Reactor Area (TRA)-628 CX(s) Applied: B1.31Date: 01/25/2016 Location(s): IdahoOffices(s): Nuclear Energy
Idaho National Laboratory Site Characterization and Environmental Monitoring (Overarching) - Rev. 2 CX(s) Applied: B3.1Date: 01/25/2016 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-670 Primary Pump Pit Platform CX(s) Applied: B2.1Date: 01/25/2016 Location(s): IdahoOffices(s): Nuclear Energy
National and Homeland Security Portable Restroom Trailer Purchase and Use CX(s) Applied: B1.24Date: 01/13/2016 Location(s): IdahoOffices(s): Nuclear Energy
Critical Infrastructure Test Range Complex High Frequency Test Bed Expansion CX(s) Applied: B1.15Date: 01/12/2016 Location(s): IdahoOffices(s): Nuclear Energy
Test Area North (TAN)-614 Potable Water Pump Replacement CX(s) Applied: B1.31Date: 01/12/2016 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-670 Control Room Break Room and 2nd Basement Bathroom Modification CX(s) Applied: B2.1Date: 01/07/2016 Location(s): IdahoOffices(s): Nuclear Energy