The project will demonstrate Polar BearTM at wellsites. Demonstration includes capture of tank vapors, heater treater gas, production of liquids, o…
WAPA will replace their structures and line hardware for phase 1 of the Fargo to Grand Forks Life Extension. Structures to be replaced on the Fargo…
Laboratory-based reservoir characterization efforts, laboratory testing, modeling and simulation, infrastructure design consultation, permitting, a…
Western Area Power Administration (WAPA) will rebuild all structures 19/3-32/3A from LaMoure Tap to Fullerton Tap on WAPA’s Edgeley-Forman 115kV tr…
Western Area Power Administration (WAPA) will accommodate a tap for Center Power Electric Cooperative to connect on the Jamestown to Edgeley 115kV …
Replacing AMI equipment within the fence of an existing distribution substation, or creating a trench within the existing electrical substation to …
WAPA proposes to repair its fence at Carrinton Substation and add snow gates to the Jamestown, Edgeley, and Carrington Substations.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding the University of North Dakota (UND) to design, develop, fabricate, and…
Equipment and infrastructure will be upgraded during the first 2 years of the project. Three existing combustion units, the Transport Reactor Demon…
Western Area Power Administration (WAPA) proposes to repair the existing parking lot and road surfaces at the Bismarck Office, Bismarck Warehouse, …