Installation of 19 sets of electronic reclosers in existing distribution substations including communications equipment in the substation building…
Location 1 - All administrative and lab activities. Location 2 - Field work activities including AIM and wellbore monitoring, electromagnetic surve…
The NDDOT and FHWA are proposing to finish upgrading approximately 62 miles of US HWY-85 to accommodate additional lanes of traffic. NDDOT/ FHWA's …
Using directional boring techniques, install underground electrical distribution cable under state andfederal highways where presently overhead ele…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Standing Rock Sioux Tribe to design, procure and construct a 1.7MW wind …
The U.S. Department of Energy (DOE) is proposing to provide funding to University of North Dakota to develop a smart image-based database and desig…
Subtask 4.2a is permitting and site access related to seismic survey area. Subtask 4.2b is the hazard survey. Subtask 4.3 is laboratory analysis, a…
Subtask 4.1 Stratigraphic test well drilling. Build a well pad and an access road. …
Sampling and characterization of rare earth/critical mineral-bearing materials, and lab experiments to produce germanium and gallium concentrates f…