This Amended Determination follows the approval of additional funding, period of performance, and new project milestones to support the project team's small-scale research and development activities to finalize their software to model and simulate construction performance using as-planned Building Information Modeling (BIM) and as-built point clouds of off-site components by employing automated data collection solutions for capturing as-built conditions of pre-fabricated components using robotics and visual sensors.
Categorical Exclusion Determination
Rebuilding 3.25 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…
Rebuilding 4.3 miles of overhead transmission line in Newport, NC, includes: surveying, vegetation trimming, boring vertical holes to set new pole…
Rebuilding 2.75 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…
Install the ADA technology to Duke Buck Station power plant. The plan involves connecting a computing device into the plant operational technology …
The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) is proposing to partner with the DOE Water Power Technologies Office (WPTO) to use uncrewed aircraft systems (UAS) to capture high-definition video and photographs of the Pioneer Wave Energy Converter (WEC) project located off the coast of Nags Head, North Carolina.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to North Carolina State University (NCSU) to prototype and characterize the performance of a novel current energy conversion device called MARINER, designed to harness power from different oceanic current sites.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Cube Yadkin Generation, LLC (New London, NC) to develop and demonstrate an integrated control solution for a photovoltaic (PV) battery energy storage system (BESS) within the existing PV-Hydro Hybrid System at the Tuckertown Hydropower Facility ("Tuckertown", New London, NC) to create a PV-BESS-Hydro tri-hybrid system.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to North Carolina State University (NCSU) to design, evaluate, fabricate, and test wave energy converter power take-off systems.