The goal of the project is to research, develop, and demonstrate a Unified Power Flow Transformer (UPFT) with integrated power electronics enabling…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to ABB Inc. to process, mold, and test polymer bonded manganese-bismuth…
The project consists of the construction of new transmission lines, the rebuild of existing electric transmission lines, construction of a new elec…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the Town of Morrisville, North Carolina, for th…
This Amended Determination follows the approval of additional funding, period of performance, and new project milestones to support the project team's small-scale research and development activities to finalize their software to model and simulate construction performance using as-planned Building Information Modeling (BIM) and as-built point clouds of off-site components by employing automated data collection solutions for capturing as-built conditions of pre-fabricated components using robotics and visual sensors.
Categorical Exclusion Determination
Rebuilding 3.25 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…
Rebuilding 4.3 miles of overhead transmission line in Newport, NC, includes: surveying, vegetation trimming, boring vertical holes to set new pole…
Rebuilding 2.75 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…
Install the ADA technology to Duke Buck Station power plant. The plan involves connecting a computing device into the plant operational technology …