Rebuilding 3.25 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…
Office of NEPA Policy and Compliance
December 5, 2025Rebuilding 3.25 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set new poles, driving pole bases, installing anchors, erecting poles, installing overhead assemblies, stringing conductor under tension, sagging conductor to temperature, clipping in conductor, deconstructing old pole line, removing old wooden and concrete poles.