Upgrade underground infrastructure, demolish and rebuild a substation, replace overhead conductors and transmission structures. …
R and D lab-scale tests in existing facility: data processing, paper studies, and reporting…
Feasibility study with limited experimental work to develop a novel chemical-looping process to produce aromatic products from methane.…
Location 1 - All administrative and lab activities. Location 2 - Field work activities including AIM and wellbore monitoring, electromagnetic surve…
Develop dynamic line ratings for transmission using measurable and predictive data from field sensors permitting optimal line capacity and accelera…
PVREA is upgrading its distribution and sub transmission grid modeling and planning environment to improve grid reliability and resiliency through …