Front-End Engineering Design (FEED) Study for a Post-Combustion Carbon Capture (PCCC) system at Calpine's Pastoria Energy Facility (PEF) in Lebec, …
Plan development of the River Parish Sequestration Project, a CO2 transportation and storage solution, and site characterization. Conduct a pipeli…
Using directional boring techniques, install underground electrical distribution cable under state andfederal highways where presently overhead ele…
Preparation of lab samples includes sectioning, mounting (hot and cold methods), planar grinding, polishing, heat treating, chemical etching, and e…
Substation installation.…
The project will install a microgrid and BESS at four locations within rural Colorado emergency management facilities. The system includes a LFP ba…
Tndhe project will install a microgrid and BESS at four locations within rural Colorado emergency management facilities. The system includes a LFP…
1.35 miles of underground fiber installed in microduct within 4 inch HDPE conduit in existing Cooperative ROW. 1.49 miles of underground fiber ins…
Laboratory experiments, office activities, computer modeling and simulation analysis, and data analysis.…