Proj management, NEPA documentation, UIC Class VI permit prep, data gathering, storage field dev plan, source feasibility study, pipeline FEED stud…
Office activities, community benefits activities, theoretical investigation, numerical modeling, computer simulation, and laboratory analysis.…
Fundamental research on cybersecurity of electric power systems. R and D in Phase I (two years) and Demonstration in Phase II (1 year).…
A new 69 kV transmission line 4.0 miles long will be constructed from the existing Winlock substation (corner of SW Kerron St. and Hining Ave.) to …
Operate an Advanced Sensors Development Laboratory at the NETL Pittsburgh site in B-83, R-315/221, B-94, R-003, and B94 206/A and 207/A.…
This program will develop a "virtual power plant"(VPP) that leverages customer-sited batteries already installed in residential locations to export…
CONCEPTUAL DESIGN / DATA PROCESSING / PAPER STUDIES / REPORTING…