Modification to Demolish Building 900A and Reconstruct Building 900 Project CX(s) Applied: B1.3, B1.15 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh B901 Mezzanine Project CX(s) Applied: B1.15, B1.23, B2.3 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 84 Gas Line Project CX(s) Applied: B2.5 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Technology Integration Program - Field Trial Site Two - Eagle Ford Shale, DeWitt County, Texas CX(s) Applied: A9, B3.1, B3.6 Date: 06/19/2013 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Electroalcoholgenesis: Bioelectrochemical Reduction of Carbon Dioxide to Butanol CX(s) Applied: B3.6Date: 06/10/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Rattlesnake-Garrison Right-of-Way Marking Project CX(s) Applied: B1.3 Date: 06/06/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Blackfeet Energy Efficiency Retrofits CX(s) Applied: B5.1 Date: 06/03/2013 Location(s): Montana Offices(s): Golden Field Office
Evaluation of High Capacity Cells for Electric Vehicle Applications CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): China Offices(s): National Energy Technology Laboratory
Rocky Ridge Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/31/2013 Location(s): Montana Offices(s): Bonneville Power Administration