Carbon Dioxide Thickeners to Improve the Performance of Carbon Dioxide Enhanced Oil Recovery and Carbon Dioxide Fracturing CX(s) Applied: B3.6Date: 03/20/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Libby-Troy Access Road Upgrades CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Power Generation Using Anchored, Buoyancy-Induced Columnar Vortices: The Solar Vortex (SoV) CX(s) Applied: B3.6, B5.15Date: 03/11/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Flexible Molecular Sieve Membranes CX(s) Applied: B3.6Date: 02/25/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
High-Efficiency Solar Fuels Reactor Concept CX(s) Applied: B3.6Date: 02/22/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Advanced Titanium Electrowinning Using Alternative Ores CX(s) Applied: B3.6Date: 02/18/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Lithium-Rich Anti-Perovskites as Superionic Solid Electrolytes CX(s) Applied: B3.6Date: 02/06/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Ultra High-Performance Supercapacitor by Using Tailor-Made Molecular Spacer Grafted Graphene CX(s) Applied: B3.6Date: 02/06/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Novel Biocatalyst for Conversion of Natural Gas into Diesel Fuel CX(s) Applied: B3.6Date: 02/01/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy