Base Camp Operation services to assist in recovery and restoration after unplanned drawdown…
Award Number: DE-EE0009101, CX(s) Applied: A9, B3.6, B3.15, Advanced Manufacturing Office, Location(s): LA, Office(s): Golden Field Office
Fabricating and placing a new structural steel platform 18 inches above the existing structural steel platforms that access the 4-valve manifold.
Subcontractor shall provide all tools, materials, piping, fittings, supervision, equipment,transportation, facilities, and services to install a co…
The contractor shall assist FFPO Cyber Security Engineers with installation of Splunk Security Software Cloud Subscriptions in New Orleans.…
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required, to cut trees, brush and grass to make a “clea…
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from approximate…
The subcontractor shall supply all labor, materials, pesticides, transportation and supervision necessary to perform monthly Degas pest control ser…
To perform monthly Degas pest control services at the West Hackberry Strategic Petroleum Reserve facility.
Subcontractor shall furnish all engineering, materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services req…