In the Application, as relevant here, Calcasieu Pass asks DOE/FE to extend its 20-year export term in Order No. 4346 to a term ending on December 2050
In the Application, as relevant here, Plaquemines LNG asks DOE/FE to extend its 20-year export term in Order No. 4446 to a term ending on December 31,
To perform the work in connection with the Janitorial Services Contract at the SPR Site Bayou Choctaw.
Tearing down existing cubicles and replacing with new ones.
Demonstrating Electric Shuttles for the New Orleans Region…
To remove the existing slab and installing a new concrete slab in the K9 Kennel Building. Installing a cinderblock wall in the center of the K9 kennel and install fencing around the K9 kennels.
To install a concrete containment slab in the WH drumyard with a curb and drain valves.
This emergency repair order is to engineer and install soil stabilization to stabilize the slope failure. Also, the main access road, electrical co…
Cameron LNG, LLC (Cameron LNG), a Delaware limited liability company with its primary place of business in Houston, Texas, filed an application (Appl…
Paint 12 wellheads at the brine disposal area, and blast and paint the prover piping.…