To install a concrete containment slab in the WH drumyard with a curb and drain valves.
This emergency repair order is to engineer and install soil stabilization to stabilize the slope failure. Also, the main access road, electrical co…
Cameron LNG, LLC (Cameron LNG), a Delaware limited liability company with its primary place of business in Houston, Texas, filed an application (Appl…
Paint 12 wellheads at the brine disposal area, and blast and paint the prover piping.…
Improve the access and egress of heavy truck traffic on and off the BC Site at the South Gate.…
Coil tubing cleanout of the West Hackberry SPR brine disposal wells.…
Base Camp Operation services to assist in recovery and restoration after unplanned drawdown…
Award Number: DE-EE0009101, CX(s) Applied: A9, B3.6, B3.15, Advanced Manufacturing Office, Location(s): LA, Office(s): Golden Field Office
Fabricating and placing a new structural steel platform 18 inches above the existing structural steel platforms that access the 4-valve manifold.
Subcontractor shall provide all tools, materials, piping, fittings, supervision, equipment,transportation, facilities, and services to install a co…