Categorical Exclusion Determinations issued by Kesselring Site.
The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
The Kesselring Site Outfall 002 Redesign and Replacement Project consists of raising the bottom elevation of the Outfall 002 trench to eliminate the standing water that produces algae and the potential for turbulent discharges to the Glowegee Creek.
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
Naval Nuclear Laboratory will be contracting to perform Decontamination and Decommissioning (D and D) Projects (Task Order No. 2) to remediate, dismantle, and dispose of select above grade structures and select components associated with Building 19 (S3G Plant Support/Interactive Display Equipment (IDE) Building), Building 20 (Equipment Service Building), Building 21 (Fuel Service Building), Building 80A and 80B (M-140 Complex), and Pad 90 (MARF Reactor Access Enclosure).
The Kesselring Site Perimeter Roads Maintenance Project will rehabilitate approximately 11 miles of the Kesselring Site Perimeter Roadway System to include 6 miles of the perimeter loop road and 5 miles of spur roads.
The Kesselring Site Bathroom Refurbishment and Lactation Room Project will convert two (2) existing rooms into lactation rooms and refurbish bathrooms throughout the Kesselring Site (KS) ensuring the restrooms meet code requirements and function properly for a professional environment.
The Classified Islands project will modify existing buildings to create Vault Type Rooms (VTR).
S8G prototype has been in service for over 30 years, its structural steel support systems require refurbishment and replacement.
The KS Building (Bldg.) 28 Motor Drive Replacement (Bldg. 28 MDR) project will replace the existing main propulsion drive located in Bldg. 28 with a new power supply consisting of four new inverters and a new transformer rectifier.
The Outdoor Firing Range Project will complete maintenance activities to replace soil that has eroded over years of nonuse.