Categorical Exclusion Determinations: Kesselring Site

Categorical Exclusion Determinations issued by Kesselring Site.

The project will replace the heating, ventilation, and air conditioning equipment, including the Energy Recovery Unit (ERU) and selective heat pumps (15). The Evaporative Cooler will also be replaced.