Categorical Exclusion Determinations issued by Kesselring Site.
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
The scope of this project is to construct an annex to the west side of Building 28 to accommodate new test components…
The Kesselring Site Sealing of Site Service Water (SSW) Well 4 and Abandoned Test Well Project involves the decommissioning of 11 groundwater monitor…
The project scope consists of constructing a new load center to upgrade the existing Load Center (LC) A & B at the Kesselring Site (KS).
The Kesselring Site MARF Cooling Tower (Building 79) and Ancillary Facilities (Buildings 79A and 24A) Demolition Project will remove the structures…
Buildings 14 and 45: replacing the Building 45 and Building 14 (telephone room) chilling systems.…
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination