Northern Illinois Center for Accelerator and Detector Development Extrusion Line Facility CX(s) Applied: B1.15 Date: 02/20/2013 Location(s): Illinois Offices(s): Fermi Site Office
Hydrostatic Relief Action at the Neutrinos at the Main Injector CX(s) Applied: B3.1 Date: 01/28/2013 Location(s): Illinois Offices(s): Fermi Site Office
Long Baseline Neutrino Experiment Second Site Investigation CX(s) Applied: B3.1 Date: 01/17/2013 Location(s): Illinois Offices(s): Fermi Site Office
Geothermal Retrofit of Illinois National Guard's State Headquarters Building CX(s) Applied: A9, B2.1, B5.19 Date: 01/14/2013 Location(s): Illinois Offices(s): Golden Field Office
University of Illinois Urbana-Champaign- Cyber-Physical Modeling and Analysis for a Smart and Resilient Grid CX(s) Applied: B3.6 Date: 01/07/2013 Location(s): Illinois, Florida, Illinois Offices(s): Advanced Research Projects Agency-Energy
Refinery Upgrading of Hydropyrolysis Oil from Biomass CX(s) Applied: A9, B3.6 Date: 01/07/2013 Location(s): Illinois Offices(s): Golden Field Office
LanzaTech Inc. - Process Intensification of Biological Natural Gas Conversion through Novel Bioreactors Designs CX(s) Applied: B3.6 Date: 01/06/2014 Location(s): Georgia, Illinois, Louisiana, New York, Michigan Offices(s): Advanced Research Projects A...
Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Ad...
Advanced Hydraulic Fracturing CX(s) Applied: A9 Date: 12/20/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory
Project to "Establish a Muon Gyromagnetic Ratio Measurement (g-2) Experiment within the Muon Campus CX(s) Applied: B1.30, B1.31, B3.10 Date: 12/20/2012 Location(s): Illinois Offices(s): Fermi Site Office