Fermilab Muon Campus, including Muon to Electron Conversion Experiment and the MC-1 Building CX(s) Applied: B1.15, B3.10 Date: 06/12/2012 Location(s): Illinois Offices(s): Fermi Site Office
Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5 Date: 06/08/2012 Location(s): Illinois Offices(s): New Br...
Indoor Bench Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/08/2012 Location(s): Illinois Offices(s): New Brunswick Laboratory
Wind Energy Installations- Wind Turbine Project (ASO-CX-293) CX(s) Applied: B5.18 Date: 05/22/2012 Location(s): Illinois Offices(s): Argonne Site Office
A 35 Ton Liquid Argon Prototype Detector Will Be Built in Building PC-4 as a Prototype Detector for the Long Baseline Neutrino Experiment CX(s) Applied: B3.6 Date: 04/12/2012 Location(s): Illinois Offices(s): Fermi Site Office
System-Cost-Optimized Smart Electric Vehicle Supply Equipment for Residential Application CX(s) Applied: B3.6 Date: 02/24/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Compressor Testing of Next Generation Refrigeration Lubricants CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory
Smart Grid Capable Electric Vehicle Supply Equipment CX(s) Applied: B3.6 Date: 02/16/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Routine Activities at the Site A/Plot M, Illinois, Decommissioned Reactor Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): Illinois Offices(s): Legacy Management
Crystal Chemistry of Toxic Metal Sequestration CX(s) Applied: B3.6 Date: 02/09/2012 Location(s): Illinois Offices(s): Science, Chicago Office