A 35 Ton Liquid Argon Prototype Detector Will Be Built in Building PC-4 as a Prototype Detector for the Long Baseline Neutrino Experiment CX(s) Applied: B3.6 Date: 04/12/2012 Location(s): Illinois Offices(s): Fermi Site Office
System-Cost-Optimized Smart Electric Vehicle Supply Equipment for Residential Application CX(s) Applied: B3.6 Date: 02/24/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Compressor Testing of Next Generation Refrigeration Lubricants CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory
Smart Grid Capable Electric Vehicle Supply Equipment CX(s) Applied: B3.6 Date: 02/16/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Routine Activities at the Site A/Plot M, Illinois, Decommissioned Reactor Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): Illinois Offices(s): Legacy Management
Crystal Chemistry of Toxic Metal Sequestration CX(s) Applied: B3.6 Date: 02/09/2012 Location(s): Illinois Offices(s): Science, Chicago Office
Building Retrofits CX(s) Applied: B5.19 Date: 01/30/2012 Location(s): Illinois Offices(s): Energy Efficiency and Renewable Energy
Chicago Region SunShot Initiative CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Illinois Offices(s): Golden Field Office
Laboratory Demonstration of a New American Low-Head Hydropower Turbine CX(s) Applied: B3.6 Date: 01/17/2012 Location(s): Illinois Offices(s): Golden Field Office
Waste Management Milam High British Thermal Units Project CX(s) Applied: B5.21, B5.5 Date: 01/13/2012 Location(s): Illinois Offices(s): Golden Field Office