The proposed project would install a six ft. tall chain link fence around the structure.…
The computer room air conditioning (CRAC) system located in IF-616 (WCB) room 126H is old and needs to be replaced with an up-to-date system.…
BPA proposes to sell its Westside Substation assets and transfer ownership to Idaho Falls Power (IFP), who already owns the substation and the unde…
The Electric Power Research Institute (EPRI), in collaboration with BWXT Nuclear, PTR-Precision Technologies, Bridger Welding Engineering, Rusach I…
The project involves modifying a bus and transferring it to the Disaster Response Complex (DRC) which is a first responder training venue being dev…
This Revision addresses the construction and operation of multiple high temperature electrolysis (HTE) demonstration systems that will be located i…
The proposed are experiments designed to understand radiation-induced actinide redox chemistry in a variety of different solutions (e.g., aqueous, …
This project concerns the design, construction, installation and operation of a gaseous hydrogen supply and exhaust system for experiments in TREAT…
BPA proposes to fund Shoshone-Bannock Tribes to monitor Yellowstone cutthroat trout and remove exotic fish in Bingham County, Idaho. …
This task designs, constructs, and tests an electrically heated test loop similar to the reactor reference design to investigate the thermal perfor…