Install large wood structures and logs; develop pools; create meanders; plant riparian vegetation; and narrow the channel width by the placement of…
Construct two new storage pads at the north end of the ATR Complex forheavy equipment and other non-radiological material storage and for low-level…
DEQ-INL OP performs air monitoring, environmental radiation monitoring, terrestrial radionuclide monitoring, and water monitoring.…
As part of the Nile Ave resurfacing effort, large sections of existing road base material will need to be replaced.…
This revision addresses the proposed installation of a 12 by 40 ft trailer in a 6,000 ft2 area to support construction activities at the Specific M…
BPA proposes to provide funding to the Coeur d’Alene Tribe for small in-stream habitat improvement actions in Lake Creek and Benewah Creek watershe…
The NRAD North Radiography Station, NRS, ventilation system is currently out of service due a failed fan. …
The USGS proposes to update USGS gage site. The proposed action installs a radar unit to improve measurement accuracy.…
There are 5 projects proposed as Supplemental Environmental Projects, SEPs, to settle the penalty for DOE-ID in connection with the settlement of a…
Idaho National Laboratory, INL, and Lignetics,will work collaboratively to assess the feasibility of integrating INLs Advanced Preprocessing techno…