The latest capability upgrade requirement is to add LTE Band 4 and Band 5 capability to the existing Wireless Test Bed (WTB) LTE Network. To implem…
This EC revision includes a handful of scope additions. …
The proposed action involves aerial application of bulk sagebrush seed to areas burned by the Sheep Fire in July 2019 by Thomas Helicopter, a com…
The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms…
Bonneville Power Administration (BPA) is proposing to fund the Nez Perce Tribe (NPT) and Idaho Foundation for Parks & Lands (IFPL) to purchase a co…
The purpose of this Environmental Checklist (EC) is to address the redesign and installation of the new Advanced Test Reactor (ATR) Low Pressure Ai…
The proposed action aims to develop a next-generation high-temperature compact heat exchanger (HX) using additive manufacturing (AM) techniques wit…
Idaho National Laboratory (INL) is revising this environmental checklist (EC) from a second tier EC to a first tier EC and to clarify project scope…
Idaho National Laboratory (INL) is revising this environmental checklist (EC) from a second tier EC to a first tier EC and to clarify project scope.…