DMEA plans to clear approx. 35 miles of ROW clearing on a specific circuit that runs from 6,000-over 10,000ft. elevation.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Mary's Lake-East…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Ault-Craig (AU-C…
Funding will support the project team's small-scale research and development of an anode-free sodium cell comprising safe, low-cost, fluorine-free …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 2/1, 2/2, 2/9, 3/4, 3/6, 4/1, 4/2, 4…
Project mgmt, NEPA doc, UIC Class VI permit prep, site characterization(4.1.4,4.3 only), storage field development plan, CO2 source feasibility stu…
Engineering and construction of a commercial scale system (2 units at 2,500 BPD oil capacity), followed by six months of field testing on a Bayswat…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to the Gunnison County Electric Association, Inc. in support of …
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to United Power, Inc. (United Power) in support of their project…
The activities that are covered in this initial categorical exclusion NEPA determination are consistent with the activities under milestones 1.1 th…