CX-033440: Denver High School Microgrid for Community Resilience

Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equip…

Office of NEPA Policy and Compliance

March 13, 2025
minute read time

Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equipment and controls to integrate the LD-BESS into the existing building electrical systems, including the existing rooftop solar array. The installation is expected to include minor excavation for necessary foundation for the LD-BESS and any required enclosure(s), as well as for any electrical conduit or other equipment needed between the building and the LD-BESS location.