Funding will support the project team's small-scale research and development of a lignin-based concrete from waste biomass as a reduced-cost, lower…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Canon West – Mid…
Reconductor existing overhead lines at river crossings, replacing bare conductor with covered conductor. In some locations will convert from under…
The project scope includes replacing approximately five circuit miles of outdated copper powerline conductor with new aluminum conductor. This proj…
Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equip…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…
MVEA to reconstruct nine and one-half (9.5) miles of No. 8 CopperWeld single-phase conductor to No. 2 ACSR single-phase overhead conductor. CopperW…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to upgrade Ault (AU) Substation in Weld County, Colorado. The purpo…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Dixon Creek-Poud…