Overhead to underground conversion of powerline. 6.1 miles of earth will be excavated with 4.42 miles of overhead line removed and 10.6 miles of ne…
The proposed project is a 5MW/20MWh battery energy storage system (BESS), the construction of which includes minor grading, shallow foundations, an…
The U.S. Department of Energy's (DOE) National Laboratory of the Rockies (NLR) is proposing to partner with the Department of Defense (DoD) to inst…
The proposed project is a 5MW/20MWh battery energy storage system (BESS), the construction of which includes minor grading, shallow foundations, an…
The Office of Legacy Management (LM) is proposing to fund and complete an erosion risk flume study at the Colorado State University (CSU) Hydraulic…
LM is proposing to complete chemical well redevelopment (CWR) actions at the Rifle Disposal Site (Site) in augmentation to the physical well develo…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes toconduct routine vegetation management along its North Gunnison - …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Green Mountain-B…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency mechanical vegetation management on its existing Curecan…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to issue a license outgrant to Gunnison County Electric Association…