The objective is to design, construct, and test a novel, high-performance CO electrolysis reactor that produces two concentrated product streams: e…
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.2, National Renewable Energy Laboratory, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.2, National Renewable Energy Laboratory, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0009068, CX(s) Applied: A9, B3.6, Building Technologies Office, Location(s): CO, Office(s): Golden Field Office
WAPA, Rocky Mountain Region, proposes to complete power upgrades at the Methodist Mountain, MMT, Communication Site. …
WAPA, Rocky Mountain Region, proposes to conduct routine vegetation management along its Terry Street-Erie, TRR-EE, 115-kV Transmission Line. …
WAPA, Rocky Mountain Region, proposes to conduct routine access road maintenance on the existing road used to access Structures 7/5 to 8/1 on the B…
WAPA, Rocky Mountain Region, proposes to conduct routine vegetation management along its Curecanti-Poncha, CCI-PON, 230-kV Transmission Line.…
Advanced electrochemical sensors will be tested on site to validate the laboratory results.…
CX-021840: Vernal-Hayden 138-kV Transmission Line Access Road Maintenance and Structure Replacements
WAPA, Rocky Mountain Region, proposes to replace structures on its Vernal-Hayden, VNL-HDN, 138-kV Transmission Line in Moffat and Routt Counties, C…